The highly anticipated Navi Mumbai International Airport (NMIA) is set to begin its first phase of commercial operations on December 25, 2025, marking a major milestone in India’s aviation sector. The airport has been under development for several years and is expected to significantly reduce air traffic pressure on Mumbai’s existing Chhatrapati Shivaji Maharaj International Airport (CSMIA).
Airlines are preparing to open flight bookings for the new airport as operational clearances and final inspections near completion.
Phase 1 Ready for Launch
The first phase of NMIA includes:
One fully operational runway
Terminal 1 equipped to handle domestic flyers
Passenger handling capacity of up to 20 million annually
Modern check-in, baggage, and security systems
Advanced aerobridge and apron facilities
The airport has also completed key safety checks, emergency preparedness drills, and operational simulations before the opening date.
Why NMIA Matters for the Mumbai Region
Mumbai is among the busiest aviation hubs in India. With growing passenger demand each year, CSMIA has been handling nearly double its planned capacity.
The Navi Mumbai Airport is expected to:
Reduce congestion at existing terminals
Improve flight frequency and slot availability
Support new domestic routes
Boost air travel convenience for Navi Mumbai, Panvel, Thane and Raigad residents
Strengthen the region’s economic and industrial growth
Once fully completed, NMIA is expected to serve up to 90 million passengers annually.
Airlines Preparing New Routes
Several domestic carriers are planning to shift part of their operations to NMIA.
Travellers can expect:
Fresh domestic routes
Rapid turnaround flights
Better on-time performance due to reduced congestion
Shorter check-in and taxiing times
Bookings are expected to open shortly, with airlines announcing schedules closer to the inauguration date.
Travel Experience Expected at the New Airport
Passengers can expect:
Spacious terminal design
Automated check-in and self-bag-drop counters
Smart security lanes
Digital information systems
Enhanced food and retail options
Quick access to public transport and expressways
The airport layout focuses on minimizing walking distance and ensuring a smooth travel experience for all age groups.
Connectivity to the Airport
NMIA will be well connected through:
Mumbai Trans Harbour Link (MTHL)
Mumbai–Pune Expressway
Suburban railway extensions
Metro rail corridors (in upcoming phases)
Dedicated bus routes and taxi bays
Future connectivity upgrades are expected to further ease travel to and from the airport.
What Travellers Should Know Before December 25
Check whether your airline has shifted operations
Look out for updated boarding pass details
Plan travel time based on your location
Expect initial soft-launch operations before full scaling
Arrive early during the first few weeks for hassle-free check-in
FAQs
Q1. When will operations begin at Navi Mumbai Airport?
Operations are expected to start on December 25, 2025.
Q2. Will bookings open before the launch?
Yes, airlines are expected to open bookings shortly before the inauguration.
Q3. Will both domestic and international flights operate?
Initially, operations will focus on domestic flights. International flights are expected in later phases.
Q4. Why was Navi Mumbai Airport built?
To reduce congestion at Mumbai’s main airport and support regional travel demand.
Q5. How many people can the airport handle once complete?
Up to 90 million passengers annually after all phases are done.
Published on : 15th November
Published by : SMITA
www.vizzve.com || www.vizzveservices.com
Follow us on social media: Facebook || Linkedin || Instagram
🛡 Powered by Vizzve Financial
RBI-Registered Loan Partner | 10 Lakh+ Customers | ₹600 Cr+ Disbursed


